LatestSubpanel grounding: do you call out a missing ground?
A condo panel downstream of a meter-main disconnect, with no ground wire and a bonded neutral, is worth a callout. How to word it and when to refer.
Posts about engineering and technology.
1 article
LatestA condo panel downstream of a meter-main disconnect, with no ground wire and a bonded neutral, is worth a callout. How to word it and when to refer.
Morph uses AI to help inspectors work faster and deliver better reports.